Indian Additives Chennai Mitigation Case File

Indian Additives Limited (IAL) was established in 1989 as a joint venture between Chennai Petroleum Corporation Limited (CPCL), previously known as Madras Refineries Limited, and Chevron Oronite Company LLC, formerly Chevron Chemical Company. IAL specializes in the production and marketing of lubricating oil additives, with its manufacturing facility located in Manali, Chennai. The company has received multiple State and National safety awards and holds ISO 9001 and ISO 14001:2015 certifications.

Customer had to do replastering of internal wall and move the steel door

The premises of Indian Additives Limited (IAL) were severely impacted by the 2023 floods, with water reaching heights of nearly 80 cm (2.5 feet) within the factory, damaging valuable equipment, machinery, raw materials, finished goods, and office furniture. Lessons from this experience led the management to take proactive measures by installing flood barriers at the main gate and wicket gate. The chosen barrier height of 120 cm (4 feet) was selected to account for potential maximum water levels in the future.

Indian Additives Chennai flood barrier site assessment
Indian Additives Chennai flood barrier installation progress

We are grateful for the exceptional support from the management team at Indian Additives Limited in facilitating the installation of flood barriers. Their commitment to safety was exemplary, with each step of the process meticulously planned and executed to uphold the highest standards.

Indian Additives Chennai wicket gate flood barrier installation
Indian Additives Chennai wicket gate 1.2m flood barrier fitting

Frontier Flood Barrier team installing the wicket gate of 1.2m x 1.2m

Indian Additives Chennai main gate C-channel civil work

For the main gate, which has a 7.0 m wide opening and a height of 1.2 m, civil work was undertaken on the floor to install a heavy-duty “C-Channel” and ground sockets for removable intermediate columns. The civil support provided was exceptional, showcasing both technical expertise and a proactive approach that ensured challenges were managed smoothly.

Indian Additives Chennai main gate flood barrier installation
Indian Additives Chennai flood barrier bracket installation

After the successful installation, training was provided to the relevant teams. The session covered safe procedures during flood warnings, removal of flood barriers, and secure storage practices. The maintenance team at IAL also received hands-on experience in setting up the flood barriers.

Indian Additives Chennai main gate 1.2 meter flood barrier installed

Flood barriers of 1.2M height at IAL Main Gate, Chennai

This exceptional collaboration of the staff at IAL has significantly contributed to safeguarding our operations and has strengthened our confidence in India Additives Limited as a trusted partner in safety and resilience